Skip to content
English
  • There are no suggestions because the search field is empty.

Barista T 18-Month Preventative Maintenance Guide

18-Month preventative maintenance guide including  necessary parts.

**PM Inspection/Diagnostic Check-List**
- Check/non-return valve replacement - PM-658                
- Check auto fill probe for scale, clean or replace as needed - I-985. Drain the boiler and test the auto fill function. Observe the draining water for scale sediments. Consider boiler descaling if needed.                
- Check boiler temp probe for scale and clean or replace as needed - I-4456                
- Check group disk jet for obstructions and clean or replace as needed - I-4512                
- Perform a visual inspection of other components like solenoid valves, flowmeter, steam element flange, etc, and look for any leaks or damage.                
- Perform a visual inspection of the wiring and silicone tubing routing to check for discoloration and aging of electrical connectors and tubing junctions                

**Rebuild/Replacement Part assemblies**

a): Grouphead service (screen and gasket)
(1x) i4567
(1x)  i1600 

b): Steam valve and wand rebuild 
Steam Tap
(2x) PMKIT2
(2x) i4992 (F_246)
(x1) i4993 (F_200)
(x1) i4995 (F_1044) 
Steam Wand
(1x) i1183 (GUAR21682)
(1x) i1184
(1x) i1185
(1x) i4144 (R_1250) 
Steam Tip
(1x) i4840 
(1x) i4841 

c): Hot water tap 
(1x) i1183 (GUAR21682)
(1x) i1184
(1x) i1185
(1x) i4144 

d): Other Assemblies
d): Boiler safety valve replacement 
(1x) i991 

e): Anti-siphon valve replacement 
(1x) I-990 

f): OPV/expansion valve replacement 
(1x) i4878